logo
  • Services
  • Team Members
  • Projects
  • Contact

Julian High School

Tripartite, Inc. was selected to be the Architect of Record for the 2 million dollar renovation of this multi-building high school facility built in the 1970’s. The ADA compliance project included science and cooking laboratory modifications, door and hardware replacement, exterior paving, fire alarm modifications, emergency generator installation, plumbing upgrades, elevator replacement, wheel chair lift, pool and locker room renovation, toilet and shower room renovation extensive floor tile and carpeting replacement and terrazzo repairs.


ClientChicago Public SchoolsLocationChicago, ILCompleted2007

Share
  • Chimney Repairs at 20 Various Chicago Public Schools
  • Back to Projects
  • Bridge Elementary School

Tripartite inc. | 4720 North Virginia Ave. Chicago, IL 60625 | p: 773.681.0894